Paint Quantity, Can Count, and Tahmind Maliyet Hesaplayıcı

Enter area, coats, substrate roughness, waste ücret, and product-specific coverage to calculate required paint, can count, and tahmind maliyet in one pass.

It is a standart hesaplayıcı that works for both B2C and B2B. m²/ft², L/gal, and para birimi switching are built in from the start.

Switch between m²/ft² and L/gal from the start
Calculate coverage, coats, roughness, and waste together
Use para birimi switching and paylaşım URLs for global teams

How to use

  1. Choose the unit sistem, then select the para birimi and enter the area.
  2. Set the substrate roughness factor and waste ücret. Use a preset if it fits.
  3. Add one row per product and enter coverage, coats, pack size, and unit price.
  4. Review required paint, can count, tahmind maliyet, and leftover, then copy the result or paylaşım the URL.
Formulas

Each row is calculated independently and then summed. Can count is always rounded up.

  • Required paint per row = area × coats × roughness factor × (1 + waste ücret) ÷ coverage
  • Can count = ceil(required paint ÷ pack size)
  • Order quantity = can count × pack size
  • Leftover = order quantity - required paint
  • Tahmind maliyet = can count × unit price

Sample calculations

Metric example

Girdi Area 120 m², roughness factor 1.15, waste ücret 10%, primer 10 m²/L ×1 coat, 16 L can, 98 USD, top coat 12 m²/L ×2 coats, 15 L can, 145 USD

Çıktı Required paint 40.48 L / 3 cans / $388.00 / leftover 5.52 L

Imperial example

Girdi Area 2,500 ft², roughness factor 1.10, waste ücret 10%, exterior finish 400 ft²/gal ×1 coat, 5 gal can, 119 USD

Çıktı Required paint 7.56 gal / 2 cans / $238.00 / leftover 2.44 gal

Glossary

Area
The surface area you plan to paint. Enter it in m² or ft².
Coverage
The manufacturer's guideline for how much area one unit of paint can cover.
Coats
The number of times the same product is applied, such as primer, intermediate, or top coat passes.
Roughness factor
A multiplier that increases the required amount when the substrate is uneven or absorbent.
Waste ücret
A percentage allowance for splatter, roller holdout, and leftover in the container.
Pack size
The purchase size per can or pail. The tool rounds up to this unit.

Notlar

This tool provides planning tahmins. Always follow the site conditions and the manufacturer's specifications.

  • The actual amount changes with substrate condition, weather, humidity, and application method.
  • Can count is rounded up, so leftover is expected in many cases.
  • Check whether the product coverage is listed before dilution or after dilution before you enter it.

SSS

Should I enter coverage in m²/L or ft²/gal?

Match the selected unit sistem. When you switch the unit sistem, the area, coverage, and pack size are easier to keep aligned in the same unit family.

What should I use for the roughness factor?

Use about 1.00 for a smooth substrate and 1.10 or higher for absorbent or uneven surfaces, then adjust to the product sheet and site conditions.

Why is can count rounded up?

Paint is usually bought in whole cans or pails, so the hesaplayıcı rounds up to the smallest purchasable unit that covers the need.

Can I switch currencies?

Yes. You can switch between JPY, USD, EUR, and other common currencies so the same tahmin can be reviewed in different markets.

Can a paylaşım URL reproduce the same inputs?

Yes. The paylaşım URL button copies a URL that includes the current state.