Units
Coverage
Loss allowance
Paint Quantity Calculadora (Coverage, Coats, Dilution)
Calculate required volumes and can counts by process, pre/post dilution.
Common settings
Entradas are saved automaticallyUnits
Area=m², coverage=m²/L
Container size (purchase unit)
Preset
Container size in liters
Advanced
Coverage basis
Loss allowance
Roller/brush loading, overspray, container leftovers (0–30%)
Process inputs
Enter each process. Use + to add rows.
Process
Area
Coverage
Coats
Dilution%
Actions
Resultadoados
Copies per-process breakdown + totals
Copiar format
Required paint (pre-dilution total)
--
Required paint (post-dilution total)
--
Can count (rounded up)
--
Leftover (pre-dilution basis)
--
{cans}×{size}{unit} - pre-dilution total
Thinner total (estimate)
--
By process
How to use
- Set units and container size.
- Enter area, coverage, coats, and dilution for each process.
- Check required quantities and adjust loss if needed.
Assumptions
- Per process: area A, coverage C (area per volume), coats N, dilution D.
- Dilution D is thinner added to paint. Example: 10% → 0.1 thinner per 1 paint.
- If coverage is pre-dilution: pre = (A/C)×N, post = pre×(1+d).
- If coverage is post-dilution: post = (A/C)×N, pre = post/(1+d).
- If loss W is set: multiply pre/post by (1+w).
- Can count is calculated by rounding up the pre-dilution total to container size.
Notice
- This result is an estimate. Required quantities vary with substrate condition, temperature, absorption, application method, and losses. Follow site conditions and manufacturer specifications.
- This tool is a calculation aid and not a substitute for design, regulations, contracts, or safety requirements.
- Preset values are examples and will vary by conditions.