Foundation slab and circular placement
Input Rect(L=5, W=2, T=0.15), Circle(D=1.2, T=0.2), loss=5%, capacity=8m³
Output Net 1.73 m³ / With loss 1.82 m³ / Trucks 1 (estimate)
Add multiple shape volumes, then calculate the waste-adjusted quantity and estimated truck count.
The truck estimate explains the round-up and includes a row-by-row breakdown for checking.
Input Rect(L=5, W=2, T=0.15), Circle(D=1.2, T=0.2), loss=5%, capacity=8m³
Output Net 1.73 m³ / With loss 1.82 m³ / Trucks 1 (estimate)
Input Trapezoid(a=0.8, b=1.2, h=0.3, L=20), loss=7%, capacity=6m³
Output Divides the waste-adjusted volume by truck capacity and shows rounded loads plus margin
It is the trapezoid cross-section area multiplied by the extension length (section × length).
Yes. The tool shows a warning and still calculates the result.
The count is always rounded up to a whole load, with the rounding reason and margin shown.
Yes. Choose the primary unit; the other unit is shown as a secondary value.
No. Truck count is an estimate. Final ordering should reflect actual transport and contract conditions.