Paint Specification and Estimate Builder

Create a customer-ready coating proposal draft using the area, substrate, condition, target service life, and finish sheen.

Use it for multilingual output, shareable links, and quick handoff to customers, estimators, and field teams.

Sales-ready proposal wording
Designed for multilingual handoff
Shareable draft link
How to use

Create a customer-ready coating proposal draft using the area, substrate, condition, target service life, and finish sheen.

  1. Select a unit system, then enter the area.
  2. Select the substrate, surface condition, target service life, and finish sheen.
  3. Use advanced settings to change the project scope, exposure, proposal tone, or quantity policy.
  4. Review the draft, then copy it or share the URL with the current state.
Example cases

Input

Exterior mortar repaint

Input 120 m² / exterior / mortar / moderate deterioration / 10 years / satin

Output Work items: protection, washing, crack repair, primer, finish coat x2, and cleanup. Estimated quantities: primer about 14.2 L, finish coat about 28.4 L, repair area about 8.4 m².

Steel maintenance coating

Input 80 ft² / steel / rust / 7 years / semi-gloss

Output Work items: protection, degreasing, rust treatment, sanding, primer, finish coat x2, and cleanup. Estimated quantities: primer about 1.3 gal, finish coat about 2.6 gal, repair area about 9 ft².

Formulas

  • Paint quantity = area × coats ÷ reference coverage × allowance factor
  • Repair area = area × deterioration ratio
  • Balanced policy applies a smaller allowance than Conservative policy
  • Draft quantities are rounded up for proposal use; confirm them on site

FAQ

Can I use this output directly in an estimate?

Use this as a draft only. Check final quantities, pricing, code compliance, and site conditions before issuing it.

Does the same calculation work in every language?

Yes. Each language has its own wording, while the calculation and draft rules stay consistent.

Can it handle steel and wood surfaces?

Yes. The selected substrate changes the preparation steps, exclusions, and quantity assumptions.

Are these exact purchase quantities?

No. These are sales-oriented estimates; verify order quantities against product data and the planned waste allowance.

Can I use both m² and ft²?

Yes. Changing the unit system converts both the entered area and the coating quantities.

Glossary

Substrate
The surface being coated, such as concrete, mortar, steel, wood, or tile.
Deterioration
The condition of the existing surface, including chalking, peeling, cracking, rust, and mold.
Gloss
The finish sheen level, from matte to glossy.
Primer
A base coat that improves adhesion and prepares the surface for the finish coats.
Topcoat
The final finish coat that provides appearance and weather protection.
Exclusion
Work that is not included in the draft and must be confirmed separately.

Important notes

  • This tool creates a sales draft, not a final estimate.
  • Asbestos, lead, solvents, scaffolding, waste disposal, and legal requirements must be checked separately.
  • Color, sheen, dry-film thickness, warranty terms, and final system selection depend on the manufacturer and site conditions.
  • Confirm the print layout in Chrome, Edge, and Safari before using it in customer-facing documents.