Foundation slab + circular placement
Input Rect(L=5, W=2, T=0.15), Circle(D=1.2, T=0.2), loss=5%, capacity=8m³
Output Net 1.73 m³ / With loss 1.82 m³ / Trucks 1 (estimate)
Sum multiple shape volumes, then calculate waste-included quantity and estimated truck count.
The truck count always includes round-up reasoning, plus a row-level breakdown for verification.
Input Rect(L=5, W=2, T=0.15), Circle(D=1.2, T=0.2), loss=5%, capacity=8m³
Output Net 1.73 m³ / With loss 1.82 m³ / Trucks 1 (estimate)
Input Trapezoid(a=0.8, b=1.2, h=0.3, L=20), loss=7%, capacity=6m³
Output Divides waste-included volume by truck capacity and shows rounded loads plus margin
It represents trapezoid cross-section area multiplied by extension length (trapezoid section × length).
Yes. The tool shows a warning and still calculates the result.
It is always rounded up to an integer load, with the rounding reason and margin shown.
Yes. You select the primary unit and the other unit is shown as a secondary value.
No. Truck count is an estimate. Final ordering should match actual transport and contract conditions.