This kalkulator gives a starting point for irrigation volume and czas pracy. Actual needs vary with korona, root zone, drainage, irrigation method, upał, wind, and sun. Check long runs in the field.
Sad Irrigation Czas pracy Kalkulator
Build a referencyjny per-tree woda amount from tree age, spacing, and gleba, then calculate one irrigation czas pracy from kroplownik flow and count.
Because the model does not depend on local weather data, the same logic works in any region.
Calculate irrigation volume and czas pracy
- Even when target woda is blank, you can oszacuj czas pracy from the referencyjny midpoint.
- Enter a target woda amount to recalculate czas pracy from that exact value.
Jak używać
- Enter tree age, spacing, gleba type, kroplownik flow, and kroplownik count.
- Review the referencyjny range and enter a target woda amount if needed. Leave it blank to use the referencyjny midpoint.
- Check the czas pracy, per-kroplownik woda, and total flow.
- Copy the result or copy the share URL for use in the field.
Examples
Leave target woda blank to use the referencyjny midpoint
Słownik
Wiek drzewa
Years since planting. It anchors the referencyjny curve.
Rozstaw drzew
Distance to the next tree in the same row.
Gleba type
A simple way to express woda retention and drainage differences.
Kroplownik
One emitter outlet with a known flow rate.
Referencyjny woda
The starting woda amount built from age, spacing, and gleba.
Czas pracy
The time you run the irrigation line for one wodaing event.
Wzory
- Referencyjny midpoint = age-based woda × spacing factor × gleba factor
- Referencyjny range = midpoint × 0.8 to 1.2
- Total flow = kroplownik flow × count
- Czas pracy = target woda ÷ total flow
- Per-kroplownik woda = target woda ÷ kroplownik count
How the referencyjny woda is built
Start from tree age, then nudge it with spacing and gleba. No weather data required.
Age anchors
| Age | Base woda | Referencyjny spacing |
|---|---|---|
| 0 | 3 L/tree | 2.0 m |
| 1 | 6 L/tree | 2.2 m |
| 3 | 15 L/tree | 3.0 m |
| 6 | 30 L/tree | 4.0 m |
| 10 | 50 L/tree | 5.0 m |
| 15 | 75 L/tree | 6.0 m |
Adjustment factors
| Group | Condition | Factor |
|---|---|---|
| Gleba | Sandy gleba | 0.90 |
| Gleba | Loam | 1.00 |
| Gleba | Clay gleba | 1.10 |
| Spacing | Below 85% of referencyjny | 0.85 |
| Spacing | On the referencyjny curve | 1.00 |
| Spacing | Above 120% of referencyjny | 1.20 |
The spacing factor is clamped to 0.85-1.20, and the tool warns when the value drifts outside the referencyjny curve.
How to read gleba type
- Sandy gleba usually works better with shorter runs and more frequent cycles.
- Loam is the baseline for this kalkulator, so the midpoint is easiest to read there.
- Clay gleba can pond easily, so watch infiltration and avoid overfilling.
How to keep it region-neutral
- The model does not use weather data, so the same logic can be used across regions.
- If korona, pruning, root zone, or drainage differ a lot, fine-tune the target woda with field observation.
- Start from the structure, then tune it in the field. That keeps the workflow simple.
Frequently asked questions
Can I use it without a target woda amount?
Yes. Leave target woda blank and the kalkulator uses the referencyjny midpoint built from tree age, spacing, and gleba.
Does tree spacing mean row spacing?
In this kalkulator, tree spacing means the distance to the next tree in the same row. It does not calculate row spacing area.
Does it use weather data or ET?
No. It is designed to stay practical by using only tree structure and kroplownik flow.
Can I switch between metric and US units?
Yes. You can switch between m / ft, L / gal, and L/h / gal/h.
Notice
- This result is a guide. Korona, pruning, root zone, drainage, upał, wind, sun, and irrigation method all change the best value.
- In sandy gleba, shorter runs and more frequent cycles are often safer. In clay, watch for ponding and slow infiltration.
- If a manual target woda amount sits far outside the referencyjny range, check tree age and spacing again.