Kes asas metrik
60 t payload, 3:00 load time, 4.0 km one-way haul, 25 km/h, 1:00 wait time, 6 trucks, 1 shovel, 85% operating rate
Masa kitaran kira-kira 23.2 min, teori kira-kira 973 t/j, sebenar kira-kira 791 t/j, terhad oleh trak, disyorkan kira-kira 8 trak/shovel