Case 1: 8 workers / 1 LHD / 55 kW / 10% reserve
Girdi
Workers=8, equipment=LHD ×1, power=55 kW, condition=baseline, simultaneity=100%, local minimum=0
Çıktı
About 3.8 m³/s / 229 m³/min / 8,100 cfm. Governing criterion: diesel equipment.
Quickly tahmin required airflow from worker count, diesel equipment count, power, and condition factors.
This is a preliminary tahmin for early planning, training, and comparison. It is not a substitute for final ventilation tasarım or regulatory compliance.
All calculations stay in this tarayıcı and are not sent to any sunucu.
Notlar
Girdi / Çıktı
Girdi
Workers=8, equipment=LHD ×1, power=55 kW, condition=baseline, simultaneity=100%, local minimum=0
Çıktı
About 3.8 m³/s / 229 m³/min / 8,100 cfm. Governing criterion: diesel equipment.
Girdi
Workers=4, equipment=service truck ×1, power=30 kW, condition=controlled, simultaneity=100%, local minimum=120 m³/min, reserve=10%
Çıktı
About 2.2 m³/s / 132 m³/min / 4,700 cfm. Governing criterion: local minimum airflow.
Underground ventilation airflow calculation
Internal calculations use m³/s as the base unit.
Notlar
No. This is for preliminary tahmins, training, and comparison. Final tasarım must follow regulations, site standards, and professional judgment.
Yes. The display can switch, and the internal calculation uses SI units.
It is a reference factor for site standards, aftertreatment, maintenance state, and similar differences.
Add rows and enter the count, power, and factors for each equipment tür separately.
Yes. It runs entirely in the tarayıcı and does not use external APIs.
Internal calculations use m³/s as the base unit.