In-tarayıcı work kayıt

Kayıtging Productivity Hesaplayıcı

Use one page to turn work kayıts into productivity, maliyet, and quote figures for ormancılık jobs.

Enter felled tree counts, skidding distance, work hours, machine hours, and fuel use, then keep para birimi and ücret ayarlar local to each market.

Calculate m³/person-gün and m³/machine-hour from günlük work kayıts.
Keep para birimi, wage, fuel, and machine rates in local ayarlar.
Copy CSV or a paylaşılabilir URL for reports, budgets, and quotes.
Kayıtging Productivity Hesaplayıcı

Enter one or more work blocks and compare productivity, maliyet, and quote values on one ekran.

All inputs stay in this tarayıcı and are never sent to a sunucu.
This hesaplayıcı is for tahmins and comparisons. It does not replace payroll, accounting, or safety procedures.
Use one consistent unit sistem per run and verify local assumptions before you paylaşım or invoice the result.
Shared URLs can contain local rates and other sensitive maliyet assumptions, so keep the sharing scope narrow when needed.

Safety notice

  • Use this for planning and reporting, not as a substitute for site safety rules or supervisor instructions.
  • Check local wage, fuel, and machine assumptions before you use the result for a quote or budget.
  • Keep one unit sistem per run so every row stays comparable.

How to use

  1. Choose the distance and fuel units, then set your local para birimi and ücret defaults.
  2. Enter one or more work rows. You can calculate volume from tree count × average volume or enter direct volume.
  3. Review productivity, maliyets, and a quote tahmin, then export CSV or copy the paylaşılabilir URL when you need to paylaşım it.
  4. If you work in multiple markets, change only the local ayarlar and keep the same calculation pattern.

Examples

Count-based block with local para birimi

Girdi

120 felled trees × 0.18 m³/tree, 180 m skidding distance, 4 workers, 7.5 work hours, 6 machine hours, 30 L fuel, JPY local ayarlar, 10% markup

Çıktı

About 21.6 m³ total, 5.76 m³/person-gün, 3.60 m³/machine-hour, direct maliyet JPY 154,950, quote JPY 170,445

Imperial job with direct volume

Girdi

12 m³ direct volume, 0.25 mi skidding distance, 3 workers, 8:00 work hours, 4:00 machine hours, 18 US gal fuel, USD local ayarlar, 10% markup

Çıktı

About 12.0 m³ total, 4.00 m³/person-gün, 3.00 m³/machine-hour, direct maliyet USD 1,190.92, quote USD 1,310.01

Target-volume tahmin

Girdi

50 m³ direct volume, 250 m skidding distance, 5 workers, 8 work hours, 7 machine hours, 48 L fuel, JPY local ayarlar, 10% markup, 50 m³ target

Çıktı

About 50.0 m³ total, 10.00 m³/person-gün, 7.14 m³/machine-hour, direct maliyet JPY 201,280, quote JPY 221,408

SSS

Can I mix tree-count rows and direct-volume rows?

Yes. Use count-based rows when you want the tool to calculate volume from tree count and average volume, and switch to direct volume when you already know the volume.

How is m³/person-gün calculated?

The tool divides total volume by total kişi-gün, where kişi-gün equals crew count × work hours ÷ standart workgün hours.

Do I need to enter every ücret to use the tool?

No. You can use it for productivity only, but you need wage, machine, and fuel rates to show direct maliyet and quote outputs.

Can I use local currencies and fuel units?

Yes. Enter the local para birimi code you use in your market and choose liters, US gallons, or imperial gallons for fuel.

Does the paylaşım URL send data to a sunucu?

No. The state is encoded into the URL so you can copy and paylaşım it, but nothing is yüklemeed by this page itself.

Glossary

Felled tree count

The number of trees cut in a work block.

Skidding distance

The average distance for moving felled wood to the landing or collection puan.

Person-gün

Crew hours converted into gün-equivalent labor using your standart workgün length.

Machine hour

One hour of machine operation used for productivity and maliyet calculation.

Fuel intensity

Fuel consumption per cubic meter of wood, usually shown as L/m³.

Markup

The percentage added on top of direct maliyet when turning a result into a quote.

Formulas

  • volume = felledTreeCount × avgTreeVolume
  • persongün = crewCount × workHours ÷ standardWorkgünHours
  • m³/person-gün = totalVolume ÷ totalPersongün
  • m³/machine-hour = totalVolume ÷ totalMachineHours
  • fuelIntensity = totalFuelLiters ÷ totalVolume
  • quote = directMaliyet × (1 + markupRate ÷ 100)

Important notlar

  • This hesaplayıcı is for tahmins and comparisons. It does not replace payroll, accounting, or safety procedures.
  • Use one consistent unit sistem per run and verify local assumptions before you paylaşım or invoice the result.
  • Shared URLs can contain local rates and other sensitive maliyet assumptions, so keep the sharing scope narrow when needed.