Viewing a 20°C primer at 30°C
Proje: Exterior repaint / Site temp: 30°C / Reference temp: 20°C / Q10: 2.0 / Primer: 4-8h, masking 6h
Temperature factor 0.50, earliest recoat 2h, latest recoat 4h, masking complete 3h
Adjust data-sheet timings to site temperature and organize the schedule for proposals.
Adjust data-sheet timings to site temperature and show earliest recoat, latest recoat guideline, and masking completion in one place.
Santigrat / Fahrenhayt kullanın ve aynı ekrandan teklife hazır PDF dışa aktarın.
Proje: Exterior repaint / Site temp: 30°C / Reference temp: 20°C / Q10: 2.0 / Primer: 4-8h, masking 6h
Temperature factor 0.50, earliest recoat 2h, latest recoat 4h, masking complete 3h
Proje: Shopfront repaint / Site temp: 59°F / Reference: 77°F / Q10: 2.0 / Top coat: 8-24h, masking 12h
Temperature factor 2.00, earliest recoat 16h, latest recoat 48h, masking complete 24h
temperatureFactor = Q10 ^ ((referenceTempC - siteTempC) / 10)adjustedMinutes = referenceMinutes × temperatureFactortargetTime = startTime + adjustedMinutesSafe rounding: round earliest up, latest down, masking upUse the unit used by the site and the data sheet. Switching units converts the values.
No. Enter the reference temperature exactly as stated in the data sheet.
Minimum değerle aynı değeri girin veya boş bırakın. Eksik değerler kısmi sonuçlar olarak gösterilir.
Not in this initial version. Humidity is handled only as a caution note.
Evet. Proje adını, sıcaklık koşullarını, satırları ve ayarları geri yükler.
Evet. Teklif düzeni baskı/PDF çıktısı için tasarlanmıştır.