Case 1: 8 workers / 1 LHD / 55 kW / 10% reserve
Intrare
Workers=8, equipment=LHD ×1, power=55 kW, condition=baseline, simultaneity=100%, local minimum=0
Rezultat
About 3.8 m³/s / 229 m³/min / 8,100 cfm. Governing criterion: diesel equipment.
Quickly estimează required debit de aer from worker count, diesel equipment count, power, and condition factors.
This is a preliminary estimează for early planificare, training, and comparison. It is not a substitute for final ventilație design or regulatory compliance.
Toate calculations stay in this browser and are not sent to any server.
Nutes
Intrare / Rezultat
Intrare
Workers=8, equipment=LHD ×1, power=55 kW, condition=baseline, simultaneity=100%, local minimum=0
Rezultat
About 3.8 m³/s / 229 m³/min / 8,100 cfm. Governing criterion: diesel equipment.
Intrare
Workers=4, equipment=service camion ×1, power=30 kW, condition=controlled, simultaneity=100%, local minimum=120 m³/min, reserve=10%
Rezultat
About 2.2 m³/s / 132 m³/min / 4,700 cfm. Governing criterion: local minimum debit de aer.
Underground ventilație debit de aer calculation
Internal calculations use m³/s as the base unitate.
Nutes
Nu. This is for preliminary estimates, training, and comparison. Final design must follow regulations, site standards, and professional judgment.
Da. The display can switch, and the internal calculation uses SI unități.
It is a reference factor for site standards, aftertreatment, maintenance state, and similar differences.
Adaugă rânds and enter the count, power, and factors for each equipment type separately.
Da. It runs entirely in the browser and does not use external APIs.
Internal calculations use m³/s as the base unitate.