In-browser work buștean

Exploatare forestieră Productivitate Calculator

Folosește one page to turn work bușteni into productivitate, cost, and quote figures for silvicultură jobs.

Enter felled arbore counts, skidding distanță, work hours, machine hours, and combustibil use, then keep currency and rate setări local to each market.

Calculează m³/person-day and m³/machine-hour from daily work bușteni.
Keep currency, wage, combustibil, and machine rates in local setări.
Copiază CSV or a shareable URL for reports, budgets, and quotes.
Exploatare forestieră Productivitate Calculator

Enter one or more work blocks and compară productivitate, cost, and quote values on one screen.

Toate inputs stay in this browser and are never sent to a server.
This calculator is for estimates and comparisons. It does not replace payroll, accounting, or siguranță procedures.
Folosește one consistent unitate system per run and verify local assumptions before you partajează or invoice the rezultat.
Shared URLs can contain local rates and other sensitive cost assumptions, so keep the sharing scope narrow when needed.

Siguranță notificare

  • Folosește this for planificare and reporting, not as a substitute for site siguranță rules or supervisor instructions.
  • Verifică local wage, combustibil, and machine assumptions before you use the rezultat for a quote or budget.
  • Keep one unitate system per run so every row stays comparable.

How to use

  1. Choose the distanță and combustibil unități, then set your local currency and rate defaults.
  2. Enter one or more work rows. You can calculează volum from arbore count × average volum or enter direct volum.
  3. Review productivitate, costuri, and a quote estimează, then export CSV or copiază the shareable URL when you need to partajează it.
  4. If you work in multiple markets, change only the local setări and keep the same calculation pattern.

Examples

Count-based block with local currency

Intrare

120 felled arbori × 0.18 m³/arbore, 180 m skidding distanță, 4 workers, 7.5 work hours, 6 machine hours, 30 L combustibil, JPY local setări, 10% markup

Rezultat

About 21.6 m³ total, 5.76 m³/person-day, 3.60 m³/machine-hour, direct cost JPY 154,950, quote JPY 170,445

Imperial post with direct volum

Intrare

12 m³ direct volum, 0.25 mi skidding distanță, 3 workers, 8:00 work hours, 4:00 machine hours, 18 US gal combustibil, USD local setări, 10% markup

Rezultat

About 12.0 m³ total, 4.00 m³/person-day, 3.00 m³/machine-hour, direct cost USD 1,190.92, quote USD 1,310.01

Țintă-volum estimează

Intrare

50 m³ direct volum, 250 m skidding distanță, 5 workers, 8 work hours, 7 machine hours, 48 L combustibil, JPY local setări, 10% markup, 50 m³ țintă

Rezultat

About 50.0 m³ total, 10.00 m³/person-day, 7.14 m³/machine-hour, direct cost JPY 201,280, quote JPY 221,408

Întrebări frecvente

Can I mix arbore-count rows and direct-volum rows?

Da. Folosește count-based rows when you want the instrument to calculează volum from arbore count and average volum, and switch to direct volum when you already know the volum.

How is m³/person-day calculated?

The instrument divides total volum by total person-days, where person-days equals crew count × work hours ÷ standard workday hours.

Do I need to enter every rate to use the instrument?

Nu. You can use it for productivitate only, but you need wage, machine, and combustibil rates to show direct cost and quote outputs.

Can I use local currencies and combustibil unități?

Da. Enter the local currency code you use in your market and choose liters, US gallons, or imperial gallons for combustibil.

Does the partajează URL send data to a server?

Nu. The state is encoded into the URL so you can copiază and partajează it, but nothing is uploaded by this page itself.

Glossary

Felled arbore count

The number of arbori cut in a work block.

Skidding distanță

The average distanță for moving felled lemn to the landing or collection point.

Person-day

Crew hours converted into day-equivalent labor using your standard workday lungime.

Machine hour

Activate hour of machine operation used for productivitate and cost calculation.

Combustibil intensity

Combustibil consumption per cubic meter of lemn, usually shown as L/m³.

Markup

The percentage added on top of direct cost when turning a rezultat into a quote.

Formulas

  • volum = felledTreeCount × avgTreeVolume
  • personDays = crewCount × workHours ÷ standardWorkdayHours
  • m³/person-day = totalVolume ÷ totalPersonDays
  • m³/machine-hour = totalVolume ÷ totalMachineHours
  • fuelIntensity = totalFuelLiters ÷ totalVolume
  • quote = directCost × (1 + markupRate ÷ 100)

Important notă

  • This calculator is for estimates and comparisons. It does not replace payroll, accounting, or siguranță procedures.
  • Folosește one consistent unitate system per run and verify local assumptions before you partajează or invoice the rezultat.
  • Shared URLs can contain local rates and other sensitive cost assumptions, so keep the sharing scope narrow when needed.