Drying and recoat time planner

Use the site temperature to estimate when you can recoat or finish masking each product.

Enter the times on the product data sheet and the temperature on site. See how long to wait before the next coat or until masking can finish.

The planner uses a temperature multiplier called Q10 to give you an estimate. Print the results or save them as a PDF if you need a copy.

Adjust the estimate for site temperature
See the recoat window
Estimate the wait for masking
Print or save as PDF
Copy a link with the inputs

Plan your next coats

  1. Choose a temperature unit and type. Enter your site measurement.
  2. For each product, enter the reference temperature, recoat times, and the wait until masking can finish.
  3. Add an application start time if you want estimated clock times. Every step is timed from the same starting point.
  4. Review the estimates and warnings. Copy, share, print, or save a PDF when you need it.

Try a warmer or cooler site

A primer on a warmer site

What to enter
The site is 30°C and the primer's times are for 20°C. Set Q10 to 2.0. The data sheet gives 4 to 8 hours before recoating and 6 hours until masking can finish.
What the planner shows
The multiplier is 0.50. The estimated wait is 2 to 4 hours before recoating and 3 hours until masking can finish.

A finish coat on a cooler site

What to enter
The site is 59°F and the finish coat's times are for 77°F. Set Q10 to 2.0. Enter 8 to 24 hours before recoating and 12 hours until masking can finish.
What the planner shows
The multiplier is 2.00. The estimated wait is 16 to 48 hours before recoating and 24 hours until masking can finish.

Terms used in the planner

Temperature on the data sheet
The temperature given alongside the times on the product data sheet.
Q10
How much the estimated time changes for each 10°C difference. With a Q10 of 2.0, a site 10°C colder takes about twice as long, and a site 10°C warmer takes about half as long. Check which factor suits the product.
Minimum wait before recoating
How long you should wait before you can apply the next coat.
Maximum wait before recoating
The longest estimated wait before applying the next coat. You may need to prepare the surface again if you wait longer.
Time until masking can finish
The estimated wait until you can finish masking or protecting the surface.

How the times are worked out

  • Find the temperature difference in °C by subtracting site temperature from reference temperature. Divide the difference by 10 and raise Q10 to that power.
  • Adjusted time = the time from the data sheet × temperature multiplier
  • Estimated clock time = application start + rounded adjusted time
  • With conservative rounding, round the minimum wait and the time until masking can finish up. Round the maximum wait down.

Before putting the schedule to work

  • The Q10 calculation gives you a planning estimate. Follow the product data sheet and check the actual site conditions before deciding when to coat.
  • The calculation uses temperature alone. Check humidity, airflow, film thickness, sun, wind, and the mix ratio separately.
  • Compare the same type of temperature for the site and the data sheet. Use air with air, surface with surface, or substrate with substrate.
  • If the maximum recoat time is blank, the planner uses the minimum as a temporary value. Confirm the actual maximum with the product data sheet or manufacturer.
  • If you've waited past the maximum, check the product instructions. You may need to prepare the surface again before recoating.
  • Rounding can make the minimum wait longer than the maximum. Check the times you entered and the rounding increment.

Common questions about recoat times

Can I enter temperatures in °C or °F?

Use the unit that suits your data sheet and measurements. The tool converts the temperatures you already entered when you switch units.

Where do I get the reference temperature?

Enter the temperature listed next to the times on the product data sheet. If those times are for 25°C, use 25°C as your reference.

What if I don't know the maximum recoat time?

Leave the maximum blank if you need to look it up. The planner shows a temporary value based on the minimum and flags it for review. Confirm the actual limit with the product data sheet or manufacturer.

How should I account for humidity?

The estimate adjusts for temperature alone. Check the product instructions and conditions on site for humidity, airflow, and other factors before you coat.

What does the shared link include?

Copy a link with the project name, temperatures, products, and settings. Check what's in it before you share it.

How do I save a copy for my project?

Choose Print or save as PDF. Use the browser's print dialog to print or save a PDF. Check the inputs and results before using them in a document.