Madencilik Araçlar Ore Cutoff Grade Hesaplayıcı

Ore Cutoff Grade Hesaplayıcı

Tahmin break-even cutoff grade from metal price, recovery, madencilik maliyet, processing maliyet, and G&A.

Supports unit conversion, price scenario comparison, sensitivity analiz, PDF export, and çok dilli use across regions.

Madencilik Araçlar

Calculate break-even cutoff grade instantly

Madencilik Araçlar

Compare Low / Base / High side by side

Madencilik Araçlar

Built for çok dilli and decimal-comma users

What this tool covers

Supports unit conversion, price scenario comparison, sensitivity analiz, PDF export, and çok dilli use across regions.

Instant calculation

Normalize prices and maliyets, then calculate the break-even cutoff grade immediately.

Unit conversion

Convert g/t, %, ppm, oz/t, and kg/t to absorb differences in regional notation.

Scenario comparison

Compare Low / Base / High cases by changing metal price only.

Easy to paylaşım

Save the result as a PDF from the tarayıcı print diakayıt and use it in meetings right away.

How to use

  1. 1 Enter the metal price para birimi, unit, and recovery.
  2. 2 Align madencilik maliyet, processing maliyet, and G&A to the same ore basis unit.
  3. 3 Add scenario rows if needed and review the sensitivity span.
  4. 4 Check the cutoff grade and export it by CSV or PDF.

Examples

Gold

Girdi / Çıktı

Girdi

2400 USD/oz, recovery 90%, madencilik 18 USD/t, processing 14 USD/t, G&A 8 USD/t

Çıktı

cutoff grade about 0.576 g/t (about 0.0185 oz/t, 0.0000576%, 0.576 ppm)

Copper

Girdi / Çıktı

Girdi

4.10 USD/lb, recovery 88%, madencilik 22 USD/st, processing 12 USD/st, G&A 8 USD/st

Çıktı

cutoff grade about 0.479% (about 4,790 ppm)

Silver scenario comparison

Girdi / Çıktı

Girdi

24 / 27 / 30 USD/oz, recovery 85%, total maliyet 40 USD/t

Çıktı

Low: about 61.1 g/t / Base: about 54.2 g/t / High: about 48.2 g/t

Glossary

cutoff grade
The minimum grade used as a break-even reference.
recovery
The paylaşım of metal recovered from the ore.
G&A
Short for Genel & Administrative expense.
ppm
In this tool, ppm uses the same number as g/t on a metric-tonne basis.
st / lt
Short ton and long ton. Ambiguous ton is not accepted.

Formulas

Metal price / g = metal price ÷ grams per price unit
Total maliyet / t ore = (madencilik maliyet + processing maliyet + G&A) × ore basis factor
cutoff grade (g/t) = total maliyet ÷ (metal price / g × recovery)
g/t → % = g/t ÷ 10000
g/t → oz/t = g/t ÷ 31.1034768

SSS

What is cutoff grade?

It is the minimum grade used as a break-even reference. It changes with metal price, recovery, and maliyet assumptions.

Does this tool handle payability?

Not in the first version. It assumes 100% payable and uses recovery only.

Are ppm and g/t the same?

Yes, on a metric-tonne basis this tool uses the same number for ppm and g/t. It treats 1 ppm = 1 g/t.

Can I use short ton and long ton?

Yes. Enter t, st, or lt explicitly. Ambiguous ton is not accepted.

Can I save PDF çıktı from the tarayıcı only?

Yes. The tool provides a print layout and uses the Chrome / Edge / Safari print diakayıt for PDF saving.

Notlar

  • This tool is for quick reference only and does not replace JORC / NI 43-101 / technical reports.
  • Dilution, madencilik loss, payability, royalties, taxes, and freight are not part of the core calculation.
  • Enter metal price and maliyet in the same para birimi.
  • All calculations stay inside the tarayıcı and are not sent to the sunucu.